How long do drilling operation last?
On average, drilling operations last from 3 to 4 weeks. During this time, there will be periods of intermittent activity. Initially, a crew will arrive to prepare the site. After that, equipment will be brought in to support the drilling operation. At that time the actual drilling of the well will commence. Once the well has been drilled, the well is completed, or prepared for production and the drilling rig leaves. A final crew will follow to make sure the site is cleaned up properly. What will I see after drilling is completed? Once drilling is completed Highland Rim Energy is committed to returning your land to as close to normal, as soon as possible. We also endeavor to maintain the smallest footprint possible once drilling is completed. After our clean up crews have departed there will be by necessity bare ground surrounding the wellhead. You, the landowner are free to return using the area as you normally did. Of course, Highland Rim Energy requires access to the wellhead for mai
On average, drilling operations last from 3- to 4-weeks. During this time, there will be periods of intermittent activity. Initially, a crew will arrive to prepare the site. After that, equipment will be brought in to support the drilling operation. At that time the actual drilling of the well will commence. Once the well has been drilled, the well is completed, or prepared for production and the drilling rig leaves. A final crew will follow to make sure the site is cleaned up properly. What will I see after drilling is completed? Once drilling is completed Highland Rim Energy is committed to returning your land to as close to normal, as soon as possible. We also endeavor to maintain the smallest footprint possible once drilling is completed. After our clean up crews have departed there will be, by necessity, a patch of bare ground surrounding the wellhead. You, the landowner, are free to return to using the area as you normally did. Of course, Highland Rim Energy requires access to th