Do I have to pay SaskPower to connect to the grid?
Yes. There is a Pre-Site Integration Study that needs to be completed for you to connect to SaskPower’s grid. This study is currently $300 (plus GST). That is the only fee that you pay for SaskPower to do the study to make sure your location is acceptable to connect the project you’re proposing and the only fee you pay them to come to your site to make sure that your project is acceptable, once it’s completed, to be connected to the grid.