Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

How SWTorpedo is fielded?

fielded swtorpedo
0
Posted

How SWTorpedo is fielded?

0

Selected well must be prepared in the same manner as it would be for perforation. That includes: tubing and rods removal if any. Wireline crew should confirm the desired depth at which SWTorpedo Tool will be detonated and mark the wireline with tape and/or paint. Water solution or other fluids used to depress the well must be pumped in to the well until its level reach the mark of at least 90 feet above the SWTorpedo Tool. Reusable torpedo’s head must be attached to a cable head by the female adapter with 1 7/16 in. thread. Electrical detonator must be wired and connected to a detonative cord. Connect SWTorpedo to its reusable head and lower the Tool to the mark on wireline that being made earlier. Initiate detonation. Prepare the well for exploitation.

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123