What area is included in the AUAR?
The final size and shape of the Project Area will be based on development density and subsequent sewer system capacity. The City used an environmentally and fiscally responsible approach to select a trunk sewer size that would be adequate to serve anticipated sewer service needs for the next 50 to 75 years. The Project Area has been divided into two service connection phases. The Phase I portion includes the neighborhoods that have petitioned for sewer service and annexation along with undeveloped portions of the 25-year Urban Service Area. The Phase II area represents the remaining sewer system capacity that would be available in those portions of the 25-year Urban Service Area, the 50-year Urban Reserve Area, and the Suburban Development Area that could be served by gravity-flow lines. The Project Area boundary identified to date is shown in the attached map. The final Project Area boundary will be determined after an AUAR “development scenario” is defined. The Area includes approxim