How were the trails chosen?
A 2003 Feasibility Study commissioned by Aboite New Trails and completed by a local engineering firm identified possible trail routes throughout Aboite. The routes for trails were then further prioritized based on safety concerns, construction costs, the number of residents served and connectivity to the “township hub” at the intersection of Homestead and Aboite Center Road.