Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

How Do I Drive Dock Pilings?

0
Posted

How Do I Drive Dock Pilings?

0

Driving dock pilings usually requires professional help and equipment. Still, before you invest in pile driving services there are preliminary steps you must take.Choose Dock PilingsWhen choosing your dock pilings, you want them to be long enough to extend above the water line after haven being driven into the soil a minimum of 4 feet, with 6 feet being the ideal. If you are driving the piles on a slant, you can drive each level to a different depth instead of buying piles of different lengths. Make sure the pilings are pressure treated (PT) to avoid rot and water damage. For freshwater installation, the lumber must have a .80 PT rating. For saltwater installation, you need lumber with a minimum of a 2.5 PT rating. Keep piling material in mind. Polymer is better for areas where the water freezes during the winter. And with composite or fiberglass pilings you never have to worry about rot. PVC pilings are convenient for long stretches of dock,and offer flexibility in what they are fille

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123