What are some of the features of ManEx pertaining to BOM (Bill of Materials)?
BOM can be set up by where used (work center and location on the board), buy and consigned material, whether used in a kit, free stock, or back-flush and offset days. The system can explode and contract multi-level BOM on-line including both make and phantom parts (up to 512 levels). A user can request global replacement across all BOM’s with security control. The system can maintain BOM status as active or inactive, change history and track when it was last changed.