Who installs the M-WRG?
As a rule an electrician does, or possibly a heating and ventilation installation company. If choosing the concealed installation, it is recommended that the wall boxes (assembly set M-WRG-M) be mounted already during the building phase, before the plaster is applied. The units themselves can then easily be placed at the desired point of time..