Are there erosion control requirements?
Yes. Before any development is undertakes, it is essential that state and local standards be investigated. In the case of earth disturbance within 100 feet of a water resource, a permit may be required for excavating, filling, grading, placing riprap, maintaining or replacing structures including docks and retaining walls. Stormwater vegetated buffers, while not always required, are strongly encouraged to help prevent erosion and polluted runoff into water bodies. 14.) Any advice on septic systems? Answer: Yes. Septic systems can work effectively for 25 years or more if properly maintained. But its often a case of out of sight, out of mind. A system can be failing or polluting nearby surface water without there being visible signs. So before purchasing property with a septic system, ask for documentation on design, location and maintenance, look for signs of failure and have the system professionally inspected. If a new septic system is contemplated, it must be designed by a Maine lice