How long does it take to design and build a log home or timber frame home?
The amount of time that it takes to bring your project from concept to completion can vary greatly depending upon the size of the home you are building, but generally speaking you should plan on a minimum of three months for the conceptual design / feasibility study, another three months for pre-construction planning (design refinement, preparation of final construction documents, and Builder Bid Administration), and a minimum of six months for construction. ยป Search for more log home building information.