How will the installation affect the aesthetics of the building?
The maximum height for the roof mounted solar arrays is only 10 inches and will not be visible from the ground. Inverters and transformers will be installed at ground level next to the building. The area required for this equipment depends on number of Megawatts being installed. 900 square feet is required for the first Megawatt with an additional 600 square feet required for each additional megawatt. The equipment will be housed behind a fence for safety and may be monitored by a camera for security. Southern California Edison will landscape around these fenced in units to minimize their visual impact on the building’s appearance.