How long will drilling a well take?
Depending on the local geology and final depth of the well, the well usually is drilled in just one day. After the drilling crew has done their part, the pump installation crew takes over and installs the pressure system. This will take less than a day to complete. We can also install a temporary pump system for the contractor to use in construction of your home before installation of your permanent system. Most drilling contractor do not install pump systems and you lose the flexibility of scheduling by not having one contractor completing the entire water system. We pride ourselves in working closely with your general contractor keeping the project going smoothly.